974 Bay Ridge Dr, Lawrenceville, GA 30045 • 7705545696
Lilburn, GA
Milner, GA
Tucker, GA
Loganville, GA
974 Bay Ridge Dr, Lawrenceville, GA 30045
Work
Company:
Hill phoenix power systems div
Position:
Director of engineering - systems division
Education
School / High School:
Columbus Technical College
Specialities:
Engineering, Mechanical Engineering
Skills
Manufacturing • Customer Service • Continuous Improvement • Microsoft Word • Engineering • Powerpoint • Leadership • Microsoft Excel • Microsoft Office • Product Development • Six Sigma
Languages
English
Interests
Kids • Cooking • Electronics • Traveling • Outdoors • Home Improvement • International Traavel • Shooting • Crafts • Gourmet Cooking • Sports • Reading • The Arts • Travel • Home Decoration
A modular electrical distribution system includes a number of linked segments. A first electrical component is mounted in one of the segments and a second electrical component is mounted in another one of the segments. The first and second electrical components are made by different manufacturers. The linked segments are configured to be transported as a single unit without an additional external framework.
- Conyers GA, US Jeffrey E. Newel - Snellville GA, US Manu Mital - Covington GA, US John Vincent Mullis - Newnan GA, US Sean Taylor - Eatonton GA, US Grady L. Calcote - Lawrenceville GA, US
International Classification:
F25B 31/00 F25B 41/40 F25B 9/00
Abstract:
A refrigeration assembly includes a receiver tank, a heat exchanger, a first piping assembly, and a second piping assembly. The receiver tank has a fluid outlet and a fluid inlet that receives a working fluid. The heat exchanger is disposed within the receiver tank. The heat exchanger has coiled tubing that is fluidly coupled to the fluid inlet and to the fluid outlet. The first piping assembly is disposed between and is fluidly coupled to the fluid inlet and the coiled tubing. The first piping assembly has a first double riser and a first P-trap. The second piping assembly is disposed between and is fluidly coupled to the fluid outlet and the coiled tubing. The second piping assembly includes a second double riser and a second P-trap.
Hill Phoenix Power Systems Div
Director of Engineering - Systems Division
Education:
Columbus Technical College
Skills:
Manufacturing Customer Service Continuous Improvement Microsoft Word Engineering Powerpoint Leadership Microsoft Excel Microsoft Office Product Development Six Sigma
Interests:
Kids Cooking Electronics Traveling Outdoors Home Improvement International Traavel Shooting Crafts Gourmet Cooking Sports Reading The Arts Travel Home Decoration