A method and system are provided for computing behavioral level observabilities of a digital system. In one example, a logic network is provided for performing an observability analysis at the behavioral level of a digital system. The logic network includes logic objects configured to emulate behavioral observabilities computed from a control data flow graph (CDFG), wherein the logic objects include at least one of: first logic objects configured to compute a token observable condition (TOC) of an edge of the CDFG; and second logic objects configured to compute a node observable condition (NOC) of a node of the CDFG. A logic optimization is used to optimize the logic network to obtain an optimized logic network of the behavioral observabilities.
Qi Wang - San Jose CA, US Sumit Roy - Milpitas CA, US
Assignee:
Cadence Design Systems, Inc. - San Jose CA
International Classification:
G06F 17/50
US Classification:
716 2, 716 3, 716 7, 716 6, 716 18
Abstract:
The present invention provides a method and mechanism for optimizing the power consumption of a micro-electronic circuit. According to an embodiment, when optimizing the power consumption of a micro-electronic circuit, one or more candidates for applying one or more optimization techniques may be identified. Then, the one or more candidates may be marked with the one or more optimization techniques within the micro-electronic circuit without altering the data and/or control paths of the circuit. Then, after timing and logic optimization, each power saving technique applied to the one or more candidates may be evaluated to determine whether the technique saves power and/or satisfies the timing requirement of the circuit. Further, each power saving technique applied to the one or more candidates may be evaluated to determine whether the technique is reducible, and if so, then the technique may be reduced to determine whether such reduction improves the circuit's timing.
GPR64 antibody compositions are provided. These antibodies may be used for diagnosis or treatment of cancer, especially ovarian cancer, Ewing's sarcoma, uterine cancer, and other GPR64 expressing tumor types.
Interfaces From External Systems To Time Dependent Process Parameters In Integrated Process And Product Engineering
Martin Chen - Los Gatos CA, US Shailesh P. Mane - San Jose CA, US Gaurav Sharma - San Jose CA, US Qi Wang - Cupertino CA, US Dallan Clancy - Belmont CA, US Mario Günter Rothenburg - Eppelheim, DE Uwe Kohler - Dielheim, DE
A method and apparatus for computer modeling the production process is disclosed. An integrated product and process engineering system may be a computer modeling system that models both a generic production process and a specific individual production process. The integrated product and process engineering system may store a time dependent process parameter related to the production process, having uploaded them via an interface. The time dependent process parameters may be retrieve and displayed to the user on a display using a remote function call enabled function module. The time dependent process parameters may be uploaded from an external system or revised using a remote function call enabled function module.
Optimized Mapping Of An Integrated Circuit Design To Multiple Cell Libraries During A Single Synthesis Pass
Qi Wang - San Jose CA, US Ranganathan Sankaralingam - Noida, IN
Assignee:
Cadence Design Systems, Inc. - San Jose CA
International Classification:
G06F 17/50
US Classification:
716 18, 716 17, 716 3
Abstract:
A circuit design synthesis method is provided comprising: associating a first cell library with a first block of a circuit design; associating a second cell library with a second block of the circuit design; specifying at least one constraint upon the overall circuit design; mapping a portion of the first block to a cell in the first cell library based upon the at least one constraint in view of a step of mapping a portion of the second block to a cell in the second cell library; and mapping a portion of the second block to a cell in the second cell library based upon the at least one constraint in view of the step of mapping a portion of the first block to a cell in the first cell library.
Time Dependent Process Parameters For Integrated Process And Product Engineering
Martin Chen - Los Gatos CA, US Shailesh P. Mane - San Jose CA, US Gaurav Sharma - San Jose CA, US Qi Wang - Cupertino CA, US Dallan Clancy - Belmont CA, US Mario Günter Rothenburg - Eppelheim, DE Uwe Kohler - Dielheim, DE
Assignee:
SAP AG - Walldorf
International Classification:
G06F 17/10
US Classification:
703 2
Abstract:
A method and apparatus for computer modeling the production process is disclosed. An integrated product and process engineering system may be a computer modeling system that models both a generic production process and a specific individual production process. The integrated product and process engineering system may store a time dependent process parameter related to the specific product design and organize the time dependent process parameters by product variants. The time dependent process parameter may have a parameter value and a start time. The time dependent process parameters may be input/output component consumption parameters, activity duration parameters, resource capacity consumption parameters, and activity scrap parameters.
Time Dependent Process Parameters And Engineering Change Number Conflict Report
Martin Chen - Los Gatos CA, US Shailesh P. Mane - San Jose CA, US Gaurav Sharma - San Jose CA, US Qi Wang - Cupertino CA, US Dallan Clancy - Belmont CA, US Mario Günter Rothenburg - Eppelheim, DE Uwe Kohler - Dielheim, DE
A method and apparatus for computer modeling the production process is disclosed. An integrated product and process engineering system may be a computer modeling system that models both a generic production process and a specific individual production process. The integrated product and process engineering system may store one or more time dependent process parameters related to the production process and one or more engineering change numbers related to different product designs. The effective time periods of the time dependent process parameters may be compared with the effective time periods of the engineering change numbers. Various flags may be associated with each comparison to indicate the validity of the time dependent process parameter.
Method For Bonding A Semiconductor Substrate To A Metal Substrate
Hamza Yilmaz - Saratoga CA, US Qi Wang - Sandy UT, US Minhua Li - Sandy UT, US Chung-Lin Wu - San Jose CA, US
Assignee:
Fairchild Semiconductor Corporation - South Portland ME
International Classification:
H01L 21/46
US Classification:
438455, 438406, 438464, 257E21088, 257E2151
Abstract:
A method of bonding a semiconductor substrate to a metal substrate is disclosed. In some embodiments the method includes forming a semiconductor device in a semiconductor substrate, the semiconductor device comprising a first surface. The method further includes obtaining a metal substrate. The metal substrate is bonded to the first surface of the semiconductor device, wherein at least a portion of the metal substrate forms an electrical terminal for the semiconductor device.
Sep 2013 to 2000 Social Work InternSchool Social Work InternPhiladelphia, PA Sep 2012 to May 2013
Education:
University of Pennsylvania Philadelphia, PA MasterMacau University of Science and Technology 2008 to 2012 Bachelor of Art in Communication and JournalismUniversity of California, Berkeley San Francisco, CA
St Peters University Hospital Pathology 254 Easton Ave FL 5, New Brunswick, NJ 08901 7327458534 (phone), 7322208595 (fax)
Education:
Medical School Beijing Med Univ, Beijing City, Beijing, China Graduated: 1986
Languages:
English
Description:
Dr. Wang graduated from the Beijing Med Univ, Beijing City, Beijing, China in 1986. She works in New Brunswick, NJ and specializes in Anatomic Pathology & Clinical Pathology. Dr. Wang is affiliated with Saint Peters University Hospital.
Cadence Design Systems Inc Software Publishers · Computer Systems Design Services
555 Riv Oaks Pkwy BLDG 1, San Jose, CA 95134 4089431234, 4089440747, 4084285914
Qi Wang
National Green Energy Technology LLC Consulting Customer Engineering and Even · Engineering, Consulting · Online Sales Import Export Wholesale Ret · Business Services · Nonclassifiable Establishments
1901 Halford Ave, Santa Clara, CA 95051 5999 Milano Ter, Fremont, CA 94555
Qi Wang
Bq Jewelry LLC
2316 Dubois St, Milpitas, CA 95035
Qi Wang Managing
TASTE OF DALIAN, LLC
5855 Sovereign Dr STE A, Houston, TX 77036 2313 NW Military Hwy, San Antonio, TX 78231
Qi Wang Principal
Cai Hong Alternative Therapies Nonclassifiable Establishments